Modifying report schedules

To modify a report schedule, take these steps:

  1. Click Reports > Saved and Scheduled Reports on the main menu. The Saved and Scheduled Reports page opens.

  2. Click the Name link that identifies the report you want to open. The Report Schedule page opens.

  3. Make changes.

  4. Click Save. A success message displays.

Related Topics

Working with the Report Schedule tool